The tunnel was equiped with a double 18-inch guage track laid with 30 pound rail for the first 13,100 feet and a single track for the remainder of the distance. Two 7-ton Westinghouse locomotives powered by electricity hauled the ore and miners back and forth through the tunnel in 3-ton solid box cars.