3. Hollow concrete block, if used, must be filled solid with concrete or grout. 4. Install proper lighting with a 3 -way switch located at the pit ladder and adjacent to the openin g jamb of the top hoistway door inside the hoistway. Vertically install 2 tube, T8 Led